
01 / View
Confirm camera choice, viewing direction and recording requirements.
SITE SECURITY
Mobile surveillance for temporary and remote sites where fixed infrastructure is limited.

Designed for temporary and remote sites without grid power or fixed surveillance infrastructure, for theft prevention, intrusion monitoring and remote viewing. Check ground support, stabilizer clearance, camera sightlines, sunlight and mobile network coverage before deployment.
Camera locations, sightlines, coverage and operating schedule.
Camera and communications loads, daily hours, local sunlight and storage needs.
Mobile network availability, live viewing and recording requirements.

Confirm camera choice, viewing direction and recording requirements.

Review sunlight, obstructions, daily demand and storage requirements.

Review boundaries, ground support, access and connectivity.
Equipment and site photographs illustrate selection topics; configurations vary. No customer outcome or fixed runtime is inferred.
The VALIANT Skid-M integrates solar generation, batteries, cameras, communications and storage on a rugged, forklift-compatible steel skid. It enables rapid deployment at off-grid, remote or temporary sites for theft prevention, property protection and remote site oversight.
The VALIANT VTS3P-M integrates solar power, batteries, a camera system and a telescopic mast on a mobile trailer platform for video surveillance at temporary or remote sites. Customers may choose to use their own surveillance system. The specific power and surveillance configuration must be confirmed for each project.

Mobile surveillance
Provide the site location, camera load, surveillance coverage, operating hours, sunlight and network conditions to select the battery, mast and camera configuration.
Actual continuous runtime depends on sunlight, load and battery configuration. Camera, network, recording and electrical options follow the final technical proposal.
Verified customer-case material is not included in the current package. No customer identity, location, deployment result or savings figure is presented.
This is a forklift-compatible skid unit; relocation requires suitable load transport.
Runtime must be calculated from local sunlight, load and storage capacity.
Camera, network, recording and electrical options follow the final technical proposal.
START WITH THE REQUIREMENTS
Share the application, project location, loads and operating conditions. Discuss configuration and purchasing details with the team.
LET’S TALK ABOUT YOUR SITE